0989705 B.C. Ltd., Alderbridge Way GP Ltd. and Alderbridge Way Limited Partnership
Follow- Proceeding
- CCAACompanies' Creditors Arrangement Act, R.S.C. 1985, c. C-36, as amended
- File
- S-222758
- Industry
- Real estate · Residential development
0989705 B.C. Ltd., Alderbridge Way GP Ltd. and Alderbridge Way Limited Partnership came under the Companies' Creditors Arrangement Act on October 27, 2025, when an application was filed in the Supreme Court of British Columbia. The proceeding is carried under court file number S-222758 and remains active. The record for these three related debtors, a company, a general partner and the limited partnership itself, so far consists of the commencement application alone; no subsequent step has been entered on it.
Requisition for the continuation of the DCC application to April 15, 2026 — Notice of hearing
Notice of Application for Sealing Order of Confidential Report — Application / notice of application
Order extending the stay of proceedings to March 31, 2026 was filed.
Source: Order extending the stay of proceedings to March 31, 2026
The officer filed report no. Nineteenth Report. The Companies' remaining activities involve preserving and maintaining the undeveloped Development Property (soil berm remediation, dewatering, security) while the Monitor works to finalize a sale of substantially all assets to Romspen via a credit bid and reverse vesting order, and continues managing the wind-down of presale purchaser claims.
Source: Nineteenth Report of the Monitor
Application filed in the Supreme Court of British Columbia commencing the CCAA proceeding for the three debtors, docketed as court file S-222758.
Source: Notice of Application filed
Order extending stay of proceedings to October 31 2025 was filed.
Source: Order extending stay of proceedings to October 31 2025
The officer filed report no. Eighteenth Report. The Companies are advancing a sale of the Development Property to a Preferred Bidder under a Final Agreement pending Competition Bureau review, while the Monitor moves to disclaim presale agreements and distribute presale deposits and accrued interest.
Source: Eighteenth Report of the Monitor
Order extending stay of proceedings to June 27, 2025 was filed.
Source: Order extending stay of proceedings to June 27, 2025
The officer filed report no. Monitor's Seventeenth Report to Court. The Companies continue restructuring efforts, focused on completing a sale of the Development Property to a Preferred Bidder, obtaining a new building permit from the City of Richmond, and managing site costs (dewatering, security, site management) during the extended stay period.
The officer filed report no. Sixteenth Report. The Companies continue to hold the vacant Development Property while pursuing a new building permit, resolving a contractor's lien, and marketing the property for sale under a court-approved sale process, funded by DIP financing.
Source: Sixteenth Report of the Monitor
Order extending stay of proceedings to January 31, 2025 was filed.
Source: Order extending stay of proceedings to January 31, 2025
The officer filed report no. Fifteenth Report. The Companies' Development Property remains in a pre-construction state pending issuance of a building permit, with the Monitor overseeing a shoring/dewatering system and a sale process to market the property to prospective purchasers.
Source: Fifteenth Report of the Monitor
Order extending stay of proceedings to November 22, 2024 was filed.
Source: Order extending stay of proceedings to November 22, 2024
The officer filed report no. Fourteenth Report. The Companies continue to hold the undeveloped Development Property in Richmond, BC under CCAA protection, pursuing a new building permit, stabilizing a temporary shoring system, and preparing to launch a sale and investment solicitation process for the property.
Source: Fourteenth Report of the Monitor
Order extending stay of proceedings and Interim financing was filed.
Source: Order extending stay of proceedings and Interim financing
The officer filed report no. Thirteenth Report. The Companies' development property remains under a temporary shoring system being monitored daily, a new building permit application is under City review, and the Monitor is preparing to recommence a sale process for the property once financing and permit issues are resolved.
Source: Thirteenth Report of the Monitor
The officer filed report no. Monitor's Twelfth Report to Court. The Companies' Development Property remains under a temporary shoring system requiring ongoing monitoring and remediation, a new building permit application is under City review with issuance expected around March 15, 2024, and no active sale process is underway pending permit issuance and resolution of litigation claims.
Source: Twelfth Report of the Monitor
Order extending stay of proceedings to March 1, 2024 was filed.
Source: Order extending stay of proceedings to March 1, 2024
The officer filed report no. Eleventh Report. The Companies are pursuing a new building permit application under the 2018 Building Code and the sales and investment solicitation process (SISP) remains suspended pending resolution of priority disputes among secured creditors in related court actions.
Source: Eleventh Report of the Monitor
Order extending stay of proceedings to December 1, 2023 was filed.
Source: Order extending stay of proceedings to December 1, 2023
The officer filed report no. Ninth Report. The Monitor is progressing a building permit application for the Lands, expecting issuance around March 2024, after which it plans to recommence the sale process; it comments on the need to resolve related litigation before that process resumes.
Source: Ninth Report of the Monitor
Order extending stay of proceedings to September 29, 2023 was filed.
Source: Order extending stay of proceedings to September 29, 2023
The officer filed report no. Monitor's Eighth Report to Court. The Companies are pursuing a new building permit application for the Development Property under the 2018 Building Code, funded through increased DIP financing, with no active sales process ongoing after termination of the SISP.
Source: Eighth Report of the Monitor
The officer filed report no. Seventh Report. The Companies are pursuing a new building permit for the Development Property (Alderbridge Way site) rather than a completed sale, having terminated the SISP, and are relying on ongoing DIP financing to fund dewatering, site security, and other carrying costs during the CCAA proceedings.
Source: Seventh Report of the Monitor
Order extending stay of proceedings to February 24, 2023 was filed.
Source: Order extending stay of proceedings to February 24, 2023
The officer filed report no. Sixth Report. The Companies are pursuing a sale/investment solicitation process for a mixed-use development property while working to secure a new building permit, with the SISP terminated pending resolution of the permit issue.
Source: Sixth Report of the Monitor
Order extending stay of proceedings to December 9, 2022 was filed.
Source: Order extending stay of proceedings to December 9, 2022
The officer filed report no. Fifth Report. The Monitor continues to oversee site management of the vacant Development Property while pursuing a Sales and Investment Solicitation Process (no compliant bids received) and preparing a new building permit application required under the 2018 Building Code.
Source: Fifth Report of the Monitor
Requisition resetting the application of the Petitioners to August 19, 2022 — Application / notice of application
Application Response of GEC to the Petitioners NOA filed August 17, 2022 (returnable August 19, 2022) — Response / objection pleading
The stay of proceedings was extended to 2022-10-07.
Source: Order extending stay of proceedings to October 7, 2022
Application Response of Romspen to the Petitioners NOA filed August 10, 2022 (returnable August 11, 2022) — Response / objection pleading
The officer filed report no. Monitor's Fourth Report to Court. The Companies remain in CCAA proceedings while the Monitor conducts a sales and investment solicitation process for the undeveloped Alderbridge Way property, addresses building permit issues with the City of Richmond, and seeks additional DIP financing and an extended stay to fund site holding costs.
Source: Fourth Report of the Monitor
Notice of Application of Romspen filed August 9 2022 returnable August 11 2022 — Application / notice of application
Notice of Application of the Petitioners filed August 8, 2022 (returnable August 11, 2022) — Application / notice of application
Order extending stay of proceedings to August 12, 2022 was filed.
Source: Order extending stay of proceedings to August 12, 2022
The officer filed report no. Third Report. The Companies remain in CCAA protection, maintaining the Richmond development site (dewatering, security, geotechnical monitoring) using DIP financing while the Monitor runs a sales and investment solicitation process for the Development Property, whose bid deadlines have been extended repeatedly.
Source: Third Report of the Monitor
Notice of Application filed July 20, 2022 (returnable July 22, 2022) — Application / notice of application
The court approved a sale and investment solicitation process. A bid deadline of 2022-06-22.
Source: SISP Order
The stay of proceedings was extended to 2022-08-03.
Source: Order extending stay of proceedings to August 3, 2022 and replacement of Monitor
The officer filed report no. Second Report. The Petitioners continue to operate in the ordinary course, funding site maintenance costs (site management, security, dewatering, etc.) on the Richmond, BC property from interim financing while a court-supervised sales and investment solicitation process is launched; A&M is to be replaced as monitor by The Bowra Group Inc.
Source: Second Report of the Monitor
Order extending stay of proceedings to April 25, 2022 was filed.
Source: Order extending stay of proceedings to April 25, 2022
The officer filed report no. First Report. The Petitioners are continuing operations, including maintaining safety of the Richmond, B.C. construction project, and are working with the Monitor on a sales and investment solicitation process; the report supports extending the stay of proceedings to April 25, 2022.
Source: First Report of the Monitor
Notice of Application filed April 6, 2022 (returnable April 11, 2022) — Application / notice of application
Debtor
0989705 B.C. Ltd., Alderbridge Way GP Ltd. and Alderbridge Way Limited Partnership
Monitor
MNP
Bench
| Judge | Court | On this docket | Cases on record |
|---|---|---|---|
| Justice Fitzpatrick | Supreme Court of British Columbia | 25 orders, Apr 2022 – Apr 2026 | 60 cases on record |
Counsel of record
| Party | Counsel | First seen | Source |
|---|---|---|---|
| Applicant0989705 B.C. Ltd., Alderbridge Way GP Ltd. and Alderbridge Way Limited Partnership | Dentons Canada LLP · Kornfeld LLP · McCarthy Tétrault LLP | 25 Sep 2023 | Service list · 2 Apr 2026 |
| ApplicantMcCarthy TétraultLLP | McCarthy Tétrault LLP | 25 Sep 2023 | Application · 25 Sep 2023 |
| Creditor0989705 B.C. Ltd., Alderbridge Way Limited Partnership and Alderbridge Way GP Ltd | Fasken Martineau DuMoulin LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorAyman Khaled Rafiq Mahmoud | Bridgehouse Law LLP | 22 Feb 2024 | Application · 22 Feb 2024 |
| CreditorCIBT Education Group Inc., GEC Education City (Richmond) Limited Partnership and GEC | Harper Grey LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorCIBT Education Group Inc., GEC Education City (Richmond) Limited Partnership and GEC (Richmond) GP Inc | Miller Thomson LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorCity of Richmond | Clark Wilson LLP | 25 Sep 2023 | Application · 25 Sep 2023 |
| CreditorJV Driver International, J.V. Driver Inc. And 1185678 B.C. Ltd | McCarthy Tétrault LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorMetro-Can Construction (AT) Ltd | McLean & Armstrong LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorOnni Group | Osler, Hoskin & Harcourt LLP · Sampson Davie Fane Volpiana LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorR. Jay Management Ltd. and MNB Enterprises Inc | Cassels Brock & Blackwell LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| CreditorRomspen Investment Corporation | Blake, Cassels & Graydon LLP | 2 Apr 2026 | Service list · 2 Apr 2026 |
| # | Priority class | Creditor | Amount | Source |
|---|---|---|---|---|
| 4 | Secured | Romspen Investment Corporation · in 17 casesFirst-ranking mortgage and assignment of rents over the Real Property, registered principal amount $422,000,000 (Romspen Mortgage); beneficial direction and charge agreement; personal property security agreements from Petitioners and Guarantors; share and unit pledges; guarantees from Gatland Development Corporation, REV Holdings Ltd., REV Investments Inc., South Street Development Managers Ltd., South Street (Alderbridge) Limited Partnership, and personal guarantees from Samuel Hanson and Brent Hanson (directors/related parties). — Senior secured construction lender; suspended draws March 202 · as of 10 Feb 2021 | $158M | Filed Petition to the Court (April 1, 2022) |
| 4 | Secured | |||
| 4 | Secured | |||
| 4 | Secured | |||
| 5 | PMSI / lessors |
4 more claims in 2 classes The stack holds Secured and PMSI / lessors claims.
Every creditor and every amount, drawn to scale.
Card required. Nothing charged for 5 days. Cancel anytime.
Already a subscriber? Sign in.
See all plansLiquidation in progress — The Monitor, taking into consideration the foregoing, is of the view that the Sale Process must be further extended in order for prospective parties to engage with Romspen.Fifteenth Report of the Monitor · 19 Nov 2024
Unsecured creditors: no distribution.Notice of Application (AVO) · 13 Feb 2026
| Class | Creditor | Claims | Recovery | Basis | Source |
|---|---|---|---|---|---|
| Unsecured | Companies' subordinate creditors | — | no distribution | — | Notice of Application (AVO) · 13 Feb 2026 |
Each row is one filing's statement, copied as it reads and never computed. "Estimated" is the officer's forecast; "Under the plan" is the plan's or proposal's own term; "Final" is a declared or paid distribution; a row with no chip states no footing. A range is the two numbers stated; "of proven claims" is the document's own denominator.
As at ·
Cumulative receipts
$7.16M
As at 28 Oct 2025Nineteenth Report of the Monitor
Cumulative disbursements
As at
Cash on hand
As at
Professional fees
As at
3 more reported figures, and the 2 totals the debtor stated at filing
Each one as the filing states it, with its source.
Card required. Nothing charged for 5 days. Cancel anytime.
Already a subscriber? Sign in.
See all plans| Date | Document | File |
|---|---|---|
| Entered Approval and Vesting Order | PDF · Subscribers | |
Order Made After Application
| PDF · Subscribers | |
| Requisition for the continuation of the DCC application to April 15, 2026 | PDF · Subscribers | |
| Requisition (continuation of DCC application) | PDF · Subscribers | |
Sealing Order
| PDF · Subscribers | |
Service List
| PDF · Subscribers | |
Order Made After Application (Sealing Order)
| PDF · Subscribers | |
| Written Submissions of the Petitioner and Guarantors | PDF · Subscribers | |
| Notice of Application for Sealing Order of Confidential Report | PDF · Subscribers | |
| Affidavit #2 of Morgan Glover | PDF · Subscribers | |
| Written Submissions of GEC | PDF · Subscribers | |
| Written Submissions of Romspen Investment Corporation | PDF · Subscribers | |
| Written Submissions of the Monitor - RVO Approval | PDF · Subscribers | |
| Affidavit #1 of Pavlakovic | PDF · Subscribers | |
| Affidavit #7 of J. Austen | PDF · Subscribers | |
| Affidavit #6 of J. Austen (without exhibits) | PDF · Subscribers | |
| Monitor's Reply to Application Response | PDF · Subscribers | |
| Affidavit #1 of K. Apan | PDF · Subscribers | |
| Application Response Alderbridge | PDF · Subscribers | |
| Application Response Onni Group (AVO) | PDF · Subscribers | |
| Application Response Onni Group (DCC) | PDF · Subscribers | |
| Application Response Onni Group (Sealing Order) | PDF · Subscribers | |
| Application Response Romspen Investment Corp | PDF · Subscribers | |
| Application Response of GEC (Richmond) GP Inc. | PDF · Subscribers | |
| Affidavit #1 of Jennifer Betsayda Filed | PDF · Subscribers | |
Notice of Application (AVO)
| PDF · Subscribers | |
Notice of Application (DCC)
| PDF · Subscribers | |
| Notice of Application (Sealing Order) | PDF · Subscribers | |
Twentieth Report of the Monitor
| PDF · Subscribers | |
Order extending the stay of proceedings to March 31, 2026
| PDF · Subscribers | |
Nineteenth Report of the Monitor
| PDF · Subscribers | |
Notice of Application filed
| PDF · Subscribers | |
Order extending stay of proceedings to October 31 2025
| PDF · Subscribers | |
| Affidavit 1 of Joey Law filed June 24 2025 | PDF · Subscribers | |
Eighteenth Report of the Monitor
| PDF · Subscribers | |
Order extending stay of proceedings to June 27, 2025
| PDF · Subscribers | |
Seventeenth Report of the Monitor
| PDF · Subscribers | |
Order extending stay of proceedings to May 2, 2025
| PDF · Subscribers | |
| Notice of Application | PDF · Subscribers | |
Sixteenth Report of the Monitor
| PDF · Subscribers | |
Order extending stay of proceedings to January 31, 2025
| PDF · Subscribers | |
Fifteenth Report of the Monitor
| PDF · Subscribers | |
| Notice of Application November 19, 2024 | PDF · Subscribers | |
Order extending stay of proceedings to November 22, 2024
| PDF · Subscribers | |
Order made after Application (Sale Process)
| PDF · Subscribers | |
| Application Response July 31, 2024 | PDF · Subscribers | |
Supplemental Report to the Fourteenth Report of the Monitor
| PDF · Subscribers | |
Fourteenth Report of the Monitor
| PDF · Subscribers | |
| Notice of Application July 26 2024 | PDF · Subscribers | |
Order extending stay of proceedings and Interim financing
| PDF · Subscribers | |
| Notice of Application (May 28, 2024) | PDF · Subscribers | |
Thirteenth Report of the Monitor
| PDF · Subscribers | |
Order extending stay of proceedings to March 1, 2024
| PDF · Subscribers | |
Notice of Application (February 22, 2024)
| PDF · Subscribers | |
Twelfth Report of the Monitor
| PDF · Subscribers | |
Order extending stay of proceedings to December 1, 2023
| PDF · Subscribers | |
| Notice of Application (November 23, 2023) | PDF · Subscribers | |
Eleventh Report of the Monitor
| PDF · Subscribers | |
Order substituting MNP Ltd. as Monitor of 0989705 B.C. Ltd.
| PDF · Subscribers | |
Justice Fitzpatrick - Reasons for Judgement
| PDF · Subscribers | |
Order extending stay of proceedings to September 29, 2023
| PDF · Subscribers | |
Order lifting stay of proceedings
| PDF · Subscribers | |
| Affidavit #1 of S. Danielisz (made September 25, 2023) | PDF · Subscribers | |
Notice of Application (September 25, 2023)
| PDF · Subscribers | |
| Notice of Application (September 22, 2023) | PDF · Subscribers | |
Tenth Report of the Monitor
| PDF · Subscribers | |
Ninth Report of the Monitor
| PDF · Subscribers | |
| Affidavit #1 of B. Olson (filed July 26, 2023) | PDF · Subscribers | |
| Affidavit #4 of G. Thom (filed July 26, 2023) | PDF · Subscribers | |
| Application Response (July 26, 2023) | PDF · Subscribers | |
| Application Response (July 26, 2023) 2 | PDF · Subscribers | |
| Affidavit #1 of J. Austen (filed June 28, 2023) | PDF · Subscribers | |
| Notice of Application (June 28, 2023) | PDF · Subscribers | |
Order extending stay of proceedings to June 2, 2023
| PDF · Subscribers | |
Eighth Report of the Monitor
| PDF · Subscribers | |
| Notice of Application May 26 2023 | PDF · Subscribers | |
Order extending stay of proceedings to February 24, 2023
| PDF · Subscribers | |
| Notice of Application (February 22, 2023) | PDF · Subscribers | |
Seventh Report of the Monitor
| PDF · Subscribers | |
| Amended Notice of Application (December 16, 2022) | PDF · Subscribers | |
Order extending stay of proceedings to December 9, 2022
| PDF · Subscribers | |
| Notice of Application (December 7, 2022) | PDF · Subscribers | |
| Notice of Application (December 7, 2022) 2 | PDF · Subscribers | |
Sixth Report of the Monitor
| PDF · Subscribers | |
Supplemental Report to the Fifth Report of the Monitor
| PDF · Subscribers | |
| Notice of Application (October 5, 2022) | PDF · Subscribers | |
Fifth Report of the Monitor
| PDF · Subscribers | |
| Requisition resetting the application of the Petitioners to August 19, 2022 | PDF · Subscribers | |
| Application Response of GEC to the Petitioners NOA filed August 17, 2022 (returnable August 19, 2022) | Trustee site | |
| Affidavit #1 of J. Ratzlaff (filed August 16, 2022) | PDF · Subscribers | |
| Affidavit #1 of O. Shaporenko (filed August 16, 2022) | PDF · Subscribers | |
| Affidavit #2 of B. Diaz (filed August 16, 2022) | PDF · Subscribers | |
Order extending stay of proceedings to October 7, 2022
| PDF · Subscribers | |
| Application Response of Romspen to the Petitioners NOA filed August 10, 2022 (returnable August 11, 2022) | Trustee site | |
| Affidavit #2 of W. Roitman (filed August 9, 2022) | PDF · Subscribers | |
| Affidavit #3 of J. Alambre (filed August 9, 2022) | PDF · Subscribers | |
Fourth Report of the Monitor
| PDF · Subscribers | |
| Notice of Application of Romspen filed August 9 2022 returnable August 11 2022 | PDF · Subscribers | |
Order sealing the Monitor's Supplemental Report to the Fourth Report to Court dated August 9, 2022
| PDF · Subscribers | |
| Affidavit #1 of Belinda Diaz (filed August 8, 2022) | PDF · Subscribers | |
| Notice of Application of the Petitioners filed August 8, 2022 (returnable August 11, 2022) | PDF · Subscribers | |
Order extending stay of proceedings to August 12, 2022
| PDF · Subscribers | |
| Requisition for August 11, 2022 hearing date | PDF · Subscribers | |
| Notice of Application filed July 20, 2022 (returnable July 22, 2022) | PDF · Subscribers | |
| Requisition for July 22, 2022 hearing date | PDF · Subscribers | |
Third Report of the Monitor
| PDF · Subscribers | |
| Affidavit #1 of A. Arenas (filed April 25, 2022) | PDF · Subscribers | |
Order extending stay of proceedings to August 3, 2022 and replacement of Monitor
| PDF · Subscribers | |
SISP Order
| PDF · Subscribers | |
Second Report of the Monitor
| PDF · Subscribers | |
| Affidavit #3 of G. Thom (filed April 22, 2022) | PDF · Subscribers | |
Order extending stay of proceedings to April 25, 2022
| PDF · Subscribers | |
First Report of the Monitor
| PDF · Subscribers | |
| Notice of Application filed April 6, 2022 (returnable April 11, 2022) | PDF · Subscribers | |
| Requisition for April 11, 2022 hearing date | PDF · Subscribers | |
| Requisition for April 25, 2022 hearing date | PDF · Subscribers | |
| Affidavit #1 of G. Thom (filed April 1, 2022) | PDF · Subscribers | |
| Affidavit #1 of J. Alambre (filed April 1, 2022) | PDF · Subscribers | |
| Affidavit #2 of G. Thom (filed April 1, 2022) | PDF · Subscribers | |
| Affidavit #2 of J. Alambre (filed April 1, 2022) | PDF · Subscribers | |
| Filed Petition response of Romspen (April 1, 2022) | PDF · Subscribers | |
Filed Petition to the Court (April 1, 2022)
| PDF · Subscribers | |
Initial CCAA Order
| PDF · Subscribers | |
List of Creditors as at April 1, 2022
| PDF · Subscribers | |
| Sealing Order (Affidavit No. 2 of G. Thom and Affidavit No. 2 of J. Alambre) | PDF · Subscribers | |
Affidavit 1 of W Roitman filed April 1 2022
| PDF · Subscribers | |
First Report of the Proposed Monitor
| PDF · Subscribers | |
Filing titles and dates are public, and so is each filing's own page. The figures read from them are for subscribers.
CiteProceedings., “0989705 B.C. Ltd., Alderbridge Way GP Ltd. and Alderbridge Way Limited Partnership” (CCAA), Supreme Court of British Columbia. Retrieved 4 November 2026, https://proceedings.ca/case/0989705-bc-ltd-alderbridge-way-gp-ltd-and-alderbridge-way-limited-partnership