L.C. Greenough Construction Ltd.
Follow- Proceeding
- Bankruptcysection 49 of the Bankruptcy and Insolvency Act
- File
- 24-3396408
L.C. Greenough Construction Ltd. made a voluntary assignment into bankruptcy on July 9, 2026, under the BIA in the Court of King's Bench of Alberta, file 24-3396408. Externally compiled, unaudited entity-level statements as at October 31, 2025 show total assets of $2,484,000, current liabilities of $4,825,000, a promissory note due of $801,000 and a shareholder deficit of $(3,142,000); no stub-period statements were prepared to the date of bankruptcy. The Canada Revenue Agency has filed a deemed trust property claim of $981,856 for payroll source deductions, claiming priority over all other claims and subject to change following a trust audit, plus a separate unsecured claim of $991,221. Amrize Canada Inc. has filed a secured claim of $46,462 and Ford Credit Canada Limited one of $12,488 against a leased 2024 Ford F350; the Trustee has obtained security opinions on neither. 1358648 Alberta Ltd. holds a PPR registration but has not filed a proof of claim.
Voluntary assignment into bankruptcy filed, commencing the BIA proceeding and putting the Company's estate in the hands of the Trustee.
Source: Trustee's Report to Creditors
Debtor
L.C. Greenough Construction Ltd.
Trustee in bankruptcy
MNP
| # | Priority class | Creditor | Amount | Source |
|---|---|---|---|---|
| 3 | Deemed trusts (CRA and other) | Canada Revenue Agency · in 926 casesas filed with Trustee — Deemed trust property claim - all present and after-acquired property (payroll source deductions) — Deemed trust class, priority over all other claims; Table 3 (p.5) rounds to $982,000; claim may change following completion of a trust audit. — debtor: L.C. Greenough Construction Ltd. | $982K | Trustee's Report to Creditors |
| 3 | Deemed trusts (CRA and other) | Amrize Canada Inc. · in 2 casesas filed with Trustee — PPR registration - text states interest in all present and after-acquired property; Table 3 (p.5) describes it as 'specific serial number registration' — Security opinion not yet obtained on validity/enforceability given prevailing CRA deemed trust claim; also a claimant in prior litigation against the Company (p.8). — debtor: L.C. Greenough Construction Ltd. | $46.5K | Trustee's Report to Creditors |
| 4 | Secured | Ford Credit Canada Limited · in 60 casesas filed with Trustee — Secured - specific serial number registration (lease of 2024 Ford F350 S/D) — Security opinion not yet obtained by Trustee. — debtor: L.C. Greenough Construction Ltd. | $12.5K | Trustee's Report to Creditors |
| 4 | Secured | 1358648 Alberta Ltd.as of Trustee's Report to Creditors, July 30, 2026 — PPR registration - all present and after-acquired property — Has registered interest at PPR but had not filed a proof of claim as at the date of this report; amount shown ($1,000) is the Trustee's estimated claim per Table 3, not a filed claim amount. — debtor: L.C. Greenough Construction Ltd. | $1K | Trustee's Report to Creditors |
| 8 | Unsecured | Receiver General - Canada Revenue Agency · in 13 casesDeemed trust / CRA indebtedness; distinct from CRA's secured claim of $789,344.50 — debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.03M | First Meeting of Creditor Package |
| 8 | Unsecured | Sustainable Developmentdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $362K | First Meeting of Creditor Package |
| 8 | Unsecured | Scotiabank · in 54 casesBank listed as unsecured creditor per Creditor Mailing List — debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $95K | First Meeting of Creditor Package |
| 8 | Unsecured | Waiward Construction Management Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $87.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Antex Western Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $78.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Nordic Managing Buildig Systemsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $70.9K | First Meeting of Creditor Package |
| 8 | Unsecured | BlackStone Mechanicaldebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $66.8K | First Meeting of Creditor Package |
| 8 | Unsecured | Commander Warehouse Equipment Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $54.5K | First Meeting of Creditor Package |
| 8 | Unsecured | Advanced Foundations Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $48.3K | First Meeting of Creditor Package |
| 8 | Unsecured | Lehmann Plumbing Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $46.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Valcor Interiors Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $45.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Neil's Electricdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $38.5K | First Meeting of Creditor Package |
| 8 | Unsecured | Christensen & McLean Roofing Co. Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $36.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Star Buildersdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $36.8K | First Meeting of Creditor Package |
| 8 | Unsecured | Prairie Gold Scaffolding Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $32.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Labreche's Plumbing & Heating Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $31.7K | First Meeting of Creditor Package |
| 8 | Unsecured | CKB Constructiondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $31.5K | First Meeting of Creditor Package |
| 8 | Unsecured | TRI-Electric Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $30.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Plan Group Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $30.1K | First Meeting of Creditor Package |
| 8 | Unsecured | Energy Crane Service · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $25.4K | First Meeting of Creditor Package |
| 8 | Unsecured | Kelsey Paving Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $25K | First Meeting of Creditor Package |
| 8 | Unsecured | Rahall Mechanical Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $24.5K | First Meeting of Creditor Package |
| 8 | Unsecured | B Mac Underground Services Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $22.5K | First Meeting of Creditor Package |
| 8 | Unsecured | DBI Transportdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $22K | First Meeting of Creditor Package |
| 8 | Unsecured | Home Depot · in 16 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $21.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Greenjeans Interiorscape Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $21.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Overhead Door CO. of Edmontondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $20.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Amrize Canada Inc. · in 2 casesSame creditor also appears as a secured creditor (amount not stated) - distinct capacity — debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $20.1K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Done-Rite Floors Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $20K | First Meeting of Creditor Package |
| 8 | Unsecured | Hi Signsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $19.4K | First Meeting of Creditor Package |
| 8 | Unsecured | TRI-FAB METALS LTD.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $18.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Affordable Concrete Cutting Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $17.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Hydro-Flo Plumbing and Heating Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $17.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Anchor Engineering & Consulting Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $17.3K | First Meeting of Creditor Package |
| 8 | Unsecured | AX - Hertz Equipment Rentaldebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Giberson Brothersdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Axiom Concrete Fhinishing Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.4K | First Meeting of Creditor Package |
| 8 | Unsecured | P. Machibroda Engineering Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.3K | First Meeting of Creditor Package |
| 8 | Unsecured | Bud's E & I Servicesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Division 26 Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $16.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Conuvo Construction Materialsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $15.9K | First Meeting of Creditor Package |
| 8 | Unsecured | Mr. Plywooddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $14.9K | First Meeting of Creditor Package |
| 8 | Unsecured | East 2 West Steel Erectors Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $14.8K | First Meeting of Creditor Package |
| 8 | Unsecured | Monarch Floor (1953) Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $14.2K | First Meeting of Creditor Package |
| 8 | Unsecured | MDTdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $13.8K | First Meeting of Creditor Package |
| 8 | Unsecured | United Rentals of Canada Inc · in 11 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $13.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Phoenix Contracting 11 Incdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $13.5K | First Meeting of Creditor Package |
| 8 | Unsecured | AX - Hilti Canada Limiteddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $12.6K | First Meeting of Creditor Package |
| 8 | Unsecured | Sustainable Building Consortiumdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $12.4K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Liquid Diamond Wall Protectiondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $12.2K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Superior Lumberdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $12.2K | First Meeting of Creditor Package |
| 8 | Unsecured | Spectrum Rent Alldebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $11.8K | First Meeting of Creditor Package |
| 8 | Unsecured | Forest to Finish Cabinetry Corp.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $11.6K | First Meeting of Creditor Package |
| 8 | Unsecured | MC- Total-R Incdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $11.5K | First Meeting of Creditor Package |
| 8 | Unsecured | West Point Roofing Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $10.4K | First Meeting of Creditor Package |
| 8 | Unsecured | 4-Way Electrical Services Ltd. · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $9.18K | First Meeting of Creditor Package |
| 8 | Unsecured | Alt-Tech Incdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $9.15K | First Meeting of Creditor Package |
| 8 | Unsecured | Fire Protection Inc. · in 4 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $8.51K | First Meeting of Creditor Package |
| 8 | Unsecured | Baystar Electrical Services Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $8.33K | First Meeting of Creditor Package |
| 8 | Unsecured | Cascade HVACdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.86K | First Meeting of Creditor Package |
| 8 | Unsecured | Standard Roofing Company Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.81K | First Meeting of Creditor Package |
| 8 | Unsecured | Contract Glass & Aluminum Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.79K | First Meeting of Creditor Package |
| 8 | Unsecured | Dynamic Transport Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.79K | First Meeting of Creditor Package |
| 8 | Unsecured | Stratis Constructiondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.52K | First Meeting of Creditor Package |
| 8 | Unsecured | Behrendsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.5K | First Meeting of Creditor Package |
| 8 | Unsecured | J. Coulson Construction Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.3K | First Meeting of Creditor Package |
| 8 | Unsecured | 1999126 Alberta Ltd o/a Airesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.25K | First Meeting of Creditor Package |
| 8 | Unsecured | The Trenchless Guysdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.22K | First Meeting of Creditor Package |
| 8 | Unsecured | Kula Services Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.09K | First Meeting of Creditor Package |
| 8 | Unsecured | Acron Metal Fabrications Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $7.04K | First Meeting of Creditor Package |
| 8 | Unsecured | Rayline Welding Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.88K | First Meeting of Creditor Package |
| 8 | Unsecured | Door Systemsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.83K | First Meeting of Creditor Package |
| 8 | Unsecured | Allegion Canada Access Inc. · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.71K | First Meeting of Creditor Package |
| 8 | Unsecured | Krahn Engineering Ltd. · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.65K | First Meeting of Creditor Package |
| 8 | Unsecured | Halbar Stainless Productsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.3K | First Meeting of Creditor Package |
| 8 | Unsecured | Glass Doctor · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.28K | First Meeting of Creditor Package |
| 8 | Unsecured | Dewar Western Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.22K | First Meeting of Creditor Package |
| 8 | Unsecured | Geodetic Surveysdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.12K | First Meeting of Creditor Package |
| 8 | Unsecured | Precision Geomatica Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $6.09K | First Meeting of Creditor Package |
| 8 | Unsecured | Techno Metal Post Edmonton Area Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.68K | First Meeting of Creditor Package |
| 8 | Unsecured | 1st Choice ConstructionSite Services Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.63K | First Meeting of Creditor Package |
| 8 | Unsecured | J. R. Paine & Associates Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.55K | First Meeting of Creditor Package |
| 8 | Unsecured | Brock White Canada Company · in 4 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.37K | First Meeting of Creditor Package |
| 8 | Unsecured | A & H Steeldebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.28K | First Meeting of Creditor Package |
| 8 | Unsecured | Jackson & Jamesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $5.16K | First Meeting of Creditor Package |
| 8 | Unsecured | AX - Nu-West Construction Productsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.96K | First Meeting of Creditor Package |
| 8 | Unsecured | AX - Bobcat of Edmontondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.95K | First Meeting of Creditor Package |
| 8 | Unsecured | Norkraft Industriesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.72K | First Meeting of Creditor Package |
| 8 | Unsecured | Kodiak Metal Works Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.7K | First Meeting of Creditor Package |
| 8 | Unsecured | Alb Bros Construction/Royal Roofing Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.67K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Alberta Concrete Pumpingdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.65K | First Meeting of Creditor Package |
| 8 | Unsecured | Servall Building Solutionsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.59K | First Meeting of Creditor Package |
| 8 | Unsecured | Banister Contracting and Consultingdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.57K | First Meeting of Creditor Package |
| 8 | Unsecured | Tek Plumbing & Heating Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.53K | First Meeting of Creditor Package |
| 8 | Unsecured | Arbor Valley Cabinet Gallery · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.37K | First Meeting of Creditor Package |
| 8 | Unsecured | Crystal Clean Building Services Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.19K | First Meeting of Creditor Package |
| 8 | Unsecured | Nordic Fencing Westdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $4.15K | First Meeting of Creditor Package |
| 8 | Unsecured | NCSG · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.75K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Snowbird Rentals Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.74K | First Meeting of Creditor Package |
| 8 | Unsecured | Parkway Enterprises Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.59K | First Meeting of Creditor Package |
| 8 | Unsecured | MC - Anchorbolt Warehouse Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.47K | First Meeting of Creditor Package |
| 8 | Unsecured | Expedition Rentals · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.44K | First Meeting of Creditor Package |
| 8 | Unsecured | Prowse Barrette LLP.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.36K | First Meeting of Creditor Package |
| 8 | Unsecured | Beacon Glass Products Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.2K | First Meeting of Creditor Package |
| 8 | Unsecured | LMS Reinforcing Steel Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.18K | First Meeting of Creditor Package |
| 8 | Unsecured | WCB - Alberta · in 8 casesProvincial workers' compensation board claim — debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.18K | First Meeting of Creditor Package |
| 8 | Unsecured | Big Lake Sod Farmdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.17K | First Meeting of Creditor Package |
| 8 | Unsecured | A & B Concrete Pumpingdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.15K | First Meeting of Creditor Package |
| 8 | Unsecured | KD Electrical Consultants Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.04K | First Meeting of Creditor Package |
| 8 | Unsecured | Rainbow Contractors Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $3.03K | First Meeting of Creditor Package |
| 8 | Unsecured | J.R. Masonry Western Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.98K | First Meeting of Creditor Package |
| 8 | Unsecured | Aero Enviromental Corp.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.94K | First Meeting of Creditor Package |
| 8 | Unsecured | Alberta Wall Systems Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.89K | First Meeting of Creditor Package |
| 8 | Unsecured | Team Concept Construction Incdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.81K | First Meeting of Creditor Package |
| 8 | Unsecured | All Choice Rentals Ltd · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.77K | First Meeting of Creditor Package |
| 8 | Unsecured | Over The Top Concrete Pumping Inc. · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.45K | First Meeting of Creditor Package |
| 8 | Unsecured | Yellowhead Coring & Cutting Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $2.14K | First Meeting of Creditor Package |
| 8 | Unsecured | Alcumus Safe Contracto Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.89K | First Meeting of Creditor Package |
| 8 | Unsecured | Forbes Bros Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.81K | First Meeting of Creditor Package |
| 8 | Unsecured | In-Line Mudjacking Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.74K | First Meeting of Creditor Package |
| 8 | Unsecured | Sundance Roof Inspection & Consulting Ltd · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.64K | First Meeting of Creditor Package |
| 8 | Unsecured | United Roofing (Edmonton) Inc. · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.52K | First Meeting of Creditor Package |
| 8 | Unsecured | Power Equipment Centre · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.49K | First Meeting of Creditor Package |
| 8 | Unsecured | Alltron Systems · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.42K | First Meeting of Creditor Package |
| 8 | Unsecured | Top Roof & Exteriorsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.4K | First Meeting of Creditor Package |
| 8 | Unsecured | JacKal Electricdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.37K | First Meeting of Creditor Package |
| 8 | Unsecured | Messer · in 10 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.35K | First Meeting of Creditor Package |
| 8 | Unsecured | Scantec GRP Services, Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.34K | First Meeting of Creditor Package |
| 8 | Unsecured | Battle River Electric Ltd · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.33K | First Meeting of Creditor Package |
| 8 | Unsecured | ComplyWorks · in 5 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.25K | First Meeting of Creditor Package |
| 8 | Unsecured | McMaster - Carr · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.23K | First Meeting of Creditor Package |
| 8 | Unsecured | Uncle Rob's Oilfield Services LTddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.21K | First Meeting of Creditor Package |
| 8 | Unsecured | Purolator Courier Ltd · in 20 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.19K | First Meeting of Creditor Package |
| 8 | Unsecured | Acoustical & Total Cleaning Servicedebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.12K | First Meeting of Creditor Package |
| 8 | Unsecured | Plow Mastersdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.06K | First Meeting of Creditor Package |
| 8 | Unsecured | Apex Concrete Pumping Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.03K | First Meeting of Creditor Package |
| 8 | Unsecured | The Door and Hardware Housedebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.02K | First Meeting of Creditor Package |
| 8 | Unsecured | AX - Toshiba Business Solutionsdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1.01K | First Meeting of Creditor Package |
| 8 | Unsecured | Central Cutting & Coring (1998) Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $840 | First Meeting of Creditor Package |
| 8 | Unsecured | Drayton Valley Redi-Mixdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $743 | First Meeting of Creditor Package |
| 8 | Unsecured | Aureum Construction Servicesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $714 | First Meeting of Creditor Package |
| 8 | Unsecured | MC - P-Cann Services Ltddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $635 | First Meeting of Creditor Package |
| 8 | Unsecured | Maxx Constructiondebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $630 | First Meeting of Creditor Package |
| 8 | Unsecured | Rip & Shreddebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $542 | First Meeting of Creditor Package |
| 8 | Unsecured | Johnston Industrial Plastics · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $527 | First Meeting of Creditor Package |
| 8 | Unsecured | Concrete Imaging By Brian Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $524 | First Meeting of Creditor Package |
| 8 | Unsecured | Richelieu Hardware · in 4 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $444 | First Meeting of Creditor Package |
| 8 | Unsecured | Telus Mobility Inc · in 3 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $441 | First Meeting of Creditor Package |
| 8 | Unsecured | Ecopest Inc. · in 2 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $357 | First Meeting of Creditor Package |
| 8 | Unsecured | Edmonton Lock & Key Inc.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $292 | First Meeting of Creditor Package |
| 8 | Unsecured | Telus Communications (Edmonton) Inc · in 39 casesdebtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $285 | First Meeting of Creditor Package |
| 8 | Unsecured | 1358648 Alberta Ltd.debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1 | First Meeting of Creditor Package |
| 8 | Unsecured | CEBA Loan Collections · in 11 casesFederal COVID emergency business loan program — debtor: L.C. Greenough Construction Ltd. · as of 13 Jul 2026 | $1 | First Meeting of Creditor Package |
Unsecured creditors: no distribution.EstimatedTrustee's Report to Creditors · 30 Jul 2026
| Class | Creditor | Claims | Recovery | Basis | Source |
|---|---|---|---|---|---|
| Secured | — | — | no distribution | Estimatedper the trustee | Trustee's Report to Creditors · 30 Jul 2026 |
| Unsecured | — | — | no distribution | Estimatedper the trustee | Trustee's Report to Creditors · 30 Jul 2026 |
Each row is one filing's statement, copied as it reads and never computed. "Estimated" is the officer's forecast; "Under the plan" is the plan's or proposal's own term; "Final" is a declared or paid distribution; a row with no chip states no footing. A range is the two numbers stated; "of proven claims" is the document's own denominator.
As at 9 Jul 2026 · per Statement of Affairs (Corporate Bankruptcy), totals from the list of assets/liabilities as stated and estimated by bankrupt/debtor · L.C. Greenough Construction Ltd. (single entity) — Secured creditors $799,959.46; preferred creditors/securities/priorities $0.00; unsecured creditors $3,227,412.87; contingent/trust claims $0.00; resulting deficiency of $3,187,027.83
| Date | Document | File |
|---|---|---|
Trustee's Report to Creditors
| ||
First Meeting of Creditor Package
| ||
Certificate of Assignment
| ||
Filing titles, dates, and extracted key facts are public.
CiteProceedings., “L.C. Greenough Construction Ltd.” (Bankruptcy), Court of King's Bench of Alberta. Retrieved 20 September 2026, https://proceedings.ca/case/lc-greenough-construction-ltd